Sarla Infra and Innovations – Delivering Dreams

About To Pay Your Contractor The Advance? Get Your Quote Verified By A Team Of Construction Experts First.

Are the quantities right? Are the rates fair? Is anything missing from the scope? Are the payment terms safe? Our team checks it all. 35+ years. 665+ projects.

✓ Quantity Review✓ Rate Review✓ Scope Review✓ Contract Risk Check

YOUR PERSONALISED REPORT

₹24,99980% OFF · SAVE ₹20,000
₹4,999

Inclusive of GST · One-time payment

SPECIAL PRICE · FIRST 25 CUSTOMERS
Extra 10% OFF with code EXTRA10 · valid till 20 Oct 2026

BUY MY REPORT NOW →

The value

₹4,999 Against The Money You're About To Commit.

₹1,00,0001% of your quote
0.05%what the ₹4,999 report costs vs your quote
5.0%of just that 1%: all it takes to cover the report cost

Arithmetic illustration only. It is not a promise or estimate of savings on your quotation.

The problem

A Quote Can Look Perfect And Still Cost You Lakhs.

You're not a quantity surveyor. Your contractor is. That gap is where costs hide. Here is what we find again and again in construction quotations.

01 · VAGUE SPECIFICATIONS

"As required" Is Not A Specification

No brand, thickness, coats or warranty means you can't hold anyone to anything.

"Waterproofing as required." "Premium paint."
02 · INFLATED RATES

Rates Above Comparable Work

A rate that looks small per sq.ft. becomes lakhs across thousands of square feet.

₹310/sq.ft. vs a ₹250–280 indicative benchmark
03 · EXCESS QUANTITIES

You Pay For Area That May Not Exist

Quantities that don't match the drawings are paid for at full rate.

4,350 sq.ft. quoted vs 3,900–4,050 estimated
04 · MISSING SCOPE

Left Out Now, Charged Later

Boundary wall, landscaping, fixtures, approvals. If it isn't written, it's an extra.

"Is the kitchen included?" "That's extra."
05 · VARIATION TRAPS

"Actual Site Requirement" Clauses

Open-ended extras turn a fixed quote into a moving target.

"Additional work as per site requirement."
06 · WEAK CONTRACT TERMS

Payments, Delays & Defects Undefined

Big advances, no delay penalty and no defect liability leave you with no leverage.

"Delay penalty: not defined."
Once you sign and pay the advance, your negotiating power is gone.
The cheapest time to find a quote problem is before you sign.

The solution

Quote Check Turns A Confusing Quote Into A Clear Report.

We deconstruct your quotation line by line and give you a professional report you can use to question, clarify and negotiate.

01

We Review

Quantities, rates, scope, specifications, duplicates and contract terms are checked.

02

We Flag

Every risk is scored and ranked: high-priority issues first, clarifications next.

03

You Act

You get 7 sharp questions and clear next steps, so you sign with confidence.

The proof

This Is The Report You Will Receive.

A professional, personalised document prepared for your quotation. Below is a real deliverable layout, with illustrative data. Swipe or tap through every page.

QUOTE
CHECK

COMPLETE CONSTRUCTION
QUOTE CHECK REPORT

A professional review of your construction quotation, designed to identify pricing gaps, scope risks, omissions and potential hidden cost exposure.

PREPARED FORDEEPAK MEHTA

REPORT CREATED BY · SARLA INFRA & INNOVATIONS

01 | EXECUTIVE SUMMARY

Your quotation at a glance

78/100NEEDS REVIEW BEFORE SIGNING
₹1.845 CrQUOTE VALUE
4 · 8HIGH-PRIORITY ISSUES · CLARIFICATIONS

Overall finding: Do not reject the quotation. Resolve the high-priority scope and commercial issues, verify quantities, obtain a revised BOQ/specification schedule, then decide.

A benchmark difference is not proof of overcharging. It is a trigger for clarification and negotiation.

02 | RISK FINDINGS

Top issues to resolve before signing

01 · Waterproofing specification"Waterproofing as required" has no system, brand, thickness, testing or warranty.Recommendation: specify system + brand + application + testing + warranty.
02 · Electrical scope"Electrical work complete" is too broad: wiring, DBs, protection, fixtures, earthing.Recommendation: freeze an electrical spec and brand schedule.
03 · Flooring rateQuoted ₹310/sq.ft. vs indicative ₹250–280/sq.ft.Recommendation: confirm brand, grade, size, laying, wastage, skirting.
04 · Variation clause"Actual site requirement" can escalate cost.Recommendation: written quote + owner approval before execution.

03 | RATE & SCOPE CHECK

Where the quotation needs a closer look

CATEGORYQUOTEDINDICATIVE BENCHMARK
Flooring₹310/sq.ft.₹250–280/sq.ft.
Civil · RCC · MasonryItemised in your report
Waterproofing · Electrical · PlumbingItemised in your report

Included: Civil, RCC, Masonry, Plaster, Flooring, Plumbing, Electrical.
Confirm before signing: External development, waterproofing warranty, light fixtures, kitchen equipment, landscaping, boundary wall, approvals.

Quantity example: flooring 4,350 sq.ft. quoted vs 3,900–4,050 sq.ft. drawing-based estimate.

04 | CONTRACT & DECISION CHECK

What should be clarified in writing

Payment schedule · Advance payment · Variation procedure · Delay penalty · Defect liability · Warranty are each rated with a clear action.

7 QUESTIONS TO ASK YOUR CONTRACTOR

  1. What exact waterproofing system and brand are included?
  2. What is the exact electrical specification and brand schedule?
  3. What happens if actual quantities exceed BOQ quantities?
  4. What items are excluded from the quotation?
  5. How are variations approved and priced?
  6. What is the defect liability period?
  7. What happens if the project is delayed?

05 | FINAL VERDICT

Proceed, but do not sign yet.

74PRICE
76SCOPE
81QUANTITY
70SPECIFICATION
73COMMERCIAL TERMS
78OVERALL / 100

Benchmark figures are illustrative decision-support estimates, not guarantees of market price or determinations of contractor misconduct. Final costs depend on specifications, quantities, site conditions, brands, design and contract terms.

Sample data only. Your report is built from your own quotation.

Use case

One Sample Quote. Three Questions Worth Asking.

From the sample ₹1.845 Cr villa quotation. Illustrative arithmetic, not a client result.

QUANTITY

4,350 sq.ft. quoted. 3,900–4,050 estimated.

300–450 sq.ft. difference at ₹310/sq.ft.

₹93,000 – ₹1,39,500
RATE

₹310/sq.ft. vs ₹250–280 benchmark

₹30–60 per sq.ft. across 4,350 sq.ft.

₹1,30,500 – ₹2,61,000
CONTRACT

"Actual site requirement" extras

No approval step before added work is done.

Open-ended

Illustrative figures only. Actual findings vary by quotation.

What you buy

Your Complete Quote Check Report.

A personalised consulting-style report, prepared from your own quotation.

Trust factor

Built On Real Construction Experience.

Your quote is reviewed by Sarla Infra & Innovations, a construction company, not a software tool.

0YEARS
Construction legacy
0PROJECTS
Projects completed
0YEARS
Founder experience
TECH-ENABLEDSystematic monitoring & quality processes

Who it's for

If You're About To Sign, This Is For You.

Luxury Home Owners
Villa & Farmhouse Owners
Business Owners
Industrial Projects
Hospitality Projects
Property Investors

The bigger the commitment, the more valuable clarity becomes.

After you buy

What Happens Next. Clearly.

01

Pay Securely

Complete checkout in minutes.

02

Confirmation Email

It reaches you and our team.

03

We Contact You

Within 24 hours, for your first 15-min call. Keep your quotation and questions ready.

04

Report & Action

Get your report plus a 15-min call to walk through it.

Straight Answers

Will I definitely save money?

No. Every quotation is different. The review identifies potential cost leakage and savings opportunities where they exist. No fixed savings are guaranteed.

Do I upload my quotation here?

No. Pay, receive your confirmation email, and our team contacts you within 24 hours. Keep your quotation and questions ready.

What if my quotation is already correct?

That's valuable too. You get clarity and a list of points worth confirming in writing before you sign.

Will you tell me which contractor to choose?

No. The report gives objective information about the quotation so you can decide for yourself.

Is the sample report my real report?

No. It's an illustrative sample with sample data. Your report is built from your own quotation.

Ready?

Check The Numbers Before You Sign.

₹24,99980% OFF · SAVE ₹20,000
₹4,999

Inclusive of GST · One-time payment

SPECIAL PRICE · FIRST 25 CUSTOMERS

Extra 10% off with code EXTRA10 · valid till 20 Oct 2026

GET MY COMPLETE QUOTE CHECK REPORT →

Secure Checkout • Professional Review • Clear Actionable Report

Findings and savings vary by quotation. No fixed savings are guaranteed.

Still having doubts?

Talk To Our Expert. Free Call Back.

Not sure yet? Share your details and our team will call you back within 24 hours to answer your questions. No obligation.

Request My Call Back

⚠ Invalid email ID. Please enter a valid email (e.g. name@example.com).