▶ Watch: Er. Anubhav Choudhary walks through all 13 tools
Sarla Construction Cost Saver Kit: 13 ready-to-use Excel tools + a project Dashboard that catch vague contractor quotes, wrong material quantities, missing items and extra billing before you pay for them.
Instant download · One-time payment · Secure Razorpay checkout
▶Watch the full 10-minute walkthroughEr. Anubhav Choudhary shows every tool, on YouTube48 years. 665+ projects.
Owners of 6,00,000+ sq ft vouch for us below.
Regular price ₹4,999 from 29 November. One-time payment. Instant download. Works in Excel, Google Sheets and Numbers.
Contractor quoted ₹98,00,000. You'd really pay ₹1,34,35,400.
The kit catches all four gaps before you sign.
One-time payment · GST included · instant download
These owners avoided cost shocks on 6,00,000+ sq ft of hotels, warehouses, villas and farmhouses with Sarla's checks. Those same checks are now in your hands for ₹149.
A 2,50,000 sq ft wedding destination has hundreds of moving parts. Sarla kept every package, every contractor and every rupee on one clear plan, and that is how a project this size stays in control.
At 80,000 sq ft, one vague clause can cost lakhs. Sarla got everything in writing: scope, specs, payment stages and penalties. That discipline kept our contractors accountable till handover.
On a 60,000 sq ft hotel, small misses turn into big bills. Sarla tracked every package, every quote and every stage, so we opened on plan without the usual cost shocks.
On a 55,000 sq ft warehouse, the shed price is only half the story. Sarla flagged the flooring spec, docks and fire works upfront, so there were no surprise packages halfway through.
As an owner, I needed someone to ask the hard questions before we signed. Sarla did exactly that, and our 45,000 sq ft hotel came in close to the number we planned.
For a plywood warehouse, moisture is the real enemy. Sarla made sure roofing, drainage and waterproofing were specified and checked before they were covered, not discovered after the first monsoon.
In commercial work, every delay and every extra line hits returns. Sarla compared our contractors on true cost, not headline rate, and that one step saved us from a very expensive choice.
What I valued most was the clarity. I always knew what I was paying for, and nothing came as a surprise at the end.
In a villa, the finishes are where budgets quietly double. Sarla made every allowance clear in writing, from marble to fittings, so the spec we chose is the spec we paid for.
Every allowance, from flooring to fittings, was clear before work began. Sarla's site checks meant I knew what was done, what was pending and what it cost, without chasing anyone.
Clients of Sarla Infra & Innovations' construction and project management services. Hover to pause.
Slide to your project. This is what a missing or vague line in the quote can cost later.
at risk. The kit costs ₹149.
Excess billed at their rate.
You pay for every upgrade.
The costliest repair after you move in.
Two quotes that only look comparable.
Price rises, mid-build, on you.
Approvals, compound, sump, STP, landscaping.
One Excel workbook, from first estimate to handover. Enter your numbers; it flags the gaps.
BUY NOW & Save LakhsTurns a headline rate into the budget you'll really spend: GST, hidden costs, contingency.
36 costs quotes usually leave out, checked one by one, with your exposure in ₹.
Like-for-like true cost, so the cheapest quote can't hide its exclusions.
30 questions and a clear verdict: ready to sign, or not.
17 stages to check before concrete, plaster or tiles cover the mistakes.
27 items, from cement and steel to wiring and fittings: the brands and grades to write into your quote.
18 civil engineering tests, from cube strength to ponding and pressure tests, and the report to collect for each.
Cement bags, steel kg, sand, aggregate, bricks, paint and tiles from your area, priced at your rates. Catches a steel cap before it becomes an extra bill.
20 clauses your agreement must have: retention, delay penalty, written variations, waterproofing warranty and more.
Stage-wise payments linked to your contract. Warns you the moment you pay ahead of work done.
Every cement and steel load: brand, grade, challan, test certificate. Mismatches turn red.
Every extra item, approved in writing or not, and how much it adds to your contract.
37 room-by-room handover checks. Tells you when it is safe to release the retention.
Your whole project on one page, with red flags and a Project Health verdict.
30 extra cost items for resorts, hotels, farmhouses, warehouses and luxury villas.
Yellow cells are yours to fill. Everything else calculates.
| Base construction | Value |
| Built-up area (sq ft) | 3,500 |
| Contractor's rate per sq ft | ₹2,800 |
| Base construction cost | ₹98,00,000 |
| GST on top (18%) | ₹17,64,000 |
| Hidden costs found | ₹6,50,000 |
| Contingency (10%) | ₹12,21,400 |
| Realistic total budget | ₹1,34,35,400 |
| Gap vs headline quote | ₹36,35,400 |
| Cost item | In quote? |
| Soil testing | Not included |
| Anti-termite treatment | Included |
| Terrace and toilet waterproofing | Not included |
| Steel above estimate | Unclear |
| Compound wall and gate | Not included |
| Rainwater harvesting, STP | Unclear |
| Items not included | 3 |
| Your exposure | ₹6,50,000 |
| Question | Answer |
| Steel brand and grade named? | Yes |
| Concrete grade stated? | Yes |
| Waterproofing specified? | No |
| GST included in total? | Unclear |
| Payments tied to stages? | Yes |
| Delay penalty agreed? | No |
| High-risk gaps | 2 |
| Verdict | Not ready to sign |
Example figures for a 3,500 sq ft villa. Plus 10 more tools, the Project Dashboard and the bonus Project Add-ons tab.
Figures are examples. Your quote's gaps depend on your project.
Special price till 28 Nov, 11:59 pm · ends in
Including GST · one-time payment · ₹4,999 from 29 Nov
The Quote Check: a Sarla Infra engineer reviews your quotation line by line and tells you exactly what to fix before you sign.
Including GST. Tick it at checkout. We collect your documents after payment.
Because every owner should check their quote before signing, not only those who can hire us. The kit has the same checks our engineers use on site, priced so it's an easy yes. If you'd like an engineer to review your actual quote line by line, that's the ₹4,999 Quote Check.
Your architect designs the building. The quote is the contractor's commercial document, and usually no one checks it line by line.
It depends on your quote. The kit shows where it's missing, vague or open to extra billing. No tool can honestly promise a number.
Emailed to you right after payment. Opens in Excel, Google Sheets or Numbers.
Yes, ₹149 includes GST, with nothing added at checkout.
See our refund policy.
Tell us about your project. An engineer will call you to discuss budget, contractors and quality on site.
₹149, one time. Check your quote before you sign.
BUY NOW & Save Lakhs